Loading Events
  • This event has passed.

JTC 1/SC 25/WG 3 Meeting organized by IEC

Details

Start:
Monday, February 22, 2021
End:
Friday, February 26, 2021
Event Category:

The following link is for SC 25/WG 3 members if they want to access IEC Work Space:

https://collaborate.iec.ch/#pages/workspaces/11020/documents/

ISO/IEC JTC 1/SC 25/WG 3 N 1267A
Date: 2021-01-20
DOC TYPE: Draft Agenda
TITLE: 2nd draft agenda of 70th meeting (virtual)
SOURCE: Secretary
PROJECTs: all
STATUS: As agreed during the 69th meeting, also meeting 70 will be held as a Zoom meeting.
ACTION ID: To note
REQUESTED ACTIONs:
DUE DATE 2021-02-22
MEDIUM: Def.
No of Pages: 5 (including cover)
DISTRIBUTION: Experts of JTC 1/SC 25/WG 3, see IEC Collaboration Tool
ISO/IEC JTC 1/SC 25
INTERCONNECTION OF INFORMATION TECHNOLOGY EQUIPMENT
Secretariat: Germany (DIN)
Working Group 3 “Customer Premises Cabling”
ISO/IEC JTC 1/SC 25/WG 3 N 1267A
Date: 2021-01-20
ISO/IEC JOINT TECHNICAL COMMITTEE 1
SUBCOMMITTEE No.25: INTERCONNECTION OF
INFORMATION TECHNOLOGY EQUIPMENT
WORKING GROUP 3: CUSTOMER PREMISES CABLING
70th Meeting of WG 3
Virtual, 2021-02-22 to 26
Draft agenda and draft time table for the 70th Meeting of
ISO/IEC JTC 1/SC 25/WG 3 (virtual), 2021-02-22 to 26
MEETING TIME TABLE (based on Berlin, Germany, CET = UTC+1)
The WG 3 meeting will start Monday, 22 February, at 14:00 h and end Friday, 26 February, at 16:00 h
with ad-hocs as indicated below.
Monday
2021-02-22
Tuesday
2021-02-23
Wednesday
2021-02-24
Thursday
2021-02-25
Friday
2021-02-26
10:00–12:30 Ad
hocs:
11801-1 (BC)
14763-3 (TB)
24383 (MA)
10:00–12:30 Ad
hocs:
11801-1 (BC)
14763-3 (TB)
11801-6 (AP)
10:00–12:30 Ad
hocs
24383 (MA)
14763-5 (YM)
TR Multi drop
10:00-12:30
Ad hocs
14763-3 (TB)
14763-5 (YM)
11801-6 (AP)
13:00-15:00 WG 3 13:00-15:00 WG 3 13:00-15:00 WG 3 13:00-15:00 WG 3 13:00-15:00 WG 3
15:30-18:00 ad
hocs
11801-1 (BC)
15:30-18:00 ad
hocs
11801-1 (BC)
24383 (MA)
15:30-18:00 ad
hocs
JMTG 11801-9903
(DH)
30129
15:30-18:00 ad
hocs
JMTG 11801-9906
(DH)
14763-3 (TB)
Link to the ISO/IEC Directives JTC 1 Supplement 2019:
http://www.iec.ch/members_experts/refdocs/?ref=menu or
http://isotc.iso.org/livelink/livelink?func=ll&objId=9384365&objAction=browse&sort=name
relevant document(s)
TOP 1 Administrative Matters
TOP 1.1 Opening of the meeting, attendance record, minute taker
TOP 1.2 Approval of agenda and time table 3N1267A, 3Vir2_002
TOP 1.3 Minutes of meeting 69 3N1265
TOP 1.4 Review of action items of previous meetings 3Vir2_003
TOP 1.5 Information from the officers
ISO/IEC JTC 1/SC 25/WG 3 N 1267A
Date: 2021-01-20
3
TOP 2 General meeting and Liaison Reports
TOP 2.1 Report on JTC 1 and its SCs
TOP 2.1.1 Report on JTC 1/SC 25
TOP 2.1.2 Report on JTC 1/SC 39
TOP 2.2 Report on IEC committees
TOP 2.2.1 Report on IEC/TC 23
TOP 2.2.2 Report on IEC/TC 64
TOP 2.2.3 Report on IEC/CISPR SC/I
TOP 2.3 Report on ITU-T
TOP 2.4 Report on other bodies
TOP 2.4.1 Report on CENELEC/TC 215
TOP 2.4.2 Report on IEEE 802.3
TOP 2.5 Highlights on national level
TOP 3 Work programme and procedures
TOP 3.1 Daily minutes
TOP 3.2 Review Programme of work 3Vir2_009
TOP 3.3 Review of 3 year plan
TOP 3.4 Maintenance of WG 3 publications 3N1269
TOP 4 Structure, minimum performance and interfaces of generic cabling systems
(ISO/IEC 11801)
TOP 4.1 Project relevant liaison reports
TOP 4.1.1 Report on IEC/TC 46, SC 46A, 46C 3Vir2_014, 3Vir2_015
TOP 4.1.2 Report on IEC/TC 48, SC 48B 3Vir2_016
TOP 4.1.3 Report on IEC/TC 86, SC 86A, 86B, 86C 3Vir2_017, 3Vir2_018,
3Vir2_019
TOP 4.1.4 Report on IEC/SC 65C JWG 10 3Vir2_020
TOP 4.1.5 IEEE 802.3 3Vir2_010
TOP 4.2 General Considerations
TOP 4.2.1 Cable sharing
TOP 4.3 ISO/IEC 11801 series – develop Amendments
TOP 4.3.1 ISO/IEC 11801-1 Amendment JTC1-SC25/2991/CD
TOP 4.3.1.1 Instruction to and report from ad hoc – Brian Celella
TOP 4.3.1.2 Resolve PDAM comments
TOP 4.3.2 ISO/IEC 11801-3 Amendment JTC1-SC25/2995/FDIS
TOP 4.3.2.1 Status of FDAM ballot
TOP 4.3.3 ISO/IEC 11801-4 Amendment
ISO/IEC JTC 1/SC 25/WG 3 N 1267A
Date: 2021-01-20
4
TOP 4.3.4 ISO/IEC 11801-6 Amendment JTC1-SC25/3000/CD
TOP 4.3.4.1 Instruction to and report from ad hoc – Arne Keller
TOP 4.3.4.2 Resolve WD comments
TOP 5 Implementation and operation of customer premises cabling (ISO/IEC 14763)
TOP 5.1 Installation of cabling – ISO/IEC 14763-2 live list 3N1242
TOP 5.2 Testing of optical fibre cabling (ISO/IEC 14763-3): Revision JTC1-SC25/2992/CD
TOP 5.2.1 Instruction to and report from ad-hoc – Ton Bolhaar
TOP 5.2.2 Resolve comments on CD
TOP 5.3 Measurement of End-to-End (E2E) link (ISO/IEC 14763-4) Ed 2
TOP 5.3.1 Status of FDIS ballot JTC1-SC25/2997/FDIS
TOP 5.3.2 Resolve comments on FDIS
TOP 5.4 Sustainability (ISO/IEC 14763-5) WG 3 N 1266
TOP 5.4.1 Instruction to and report from ad hoc – Yoshiaki Mijayima
TOP 5.4.2 Resolve comments on 1st WD
TOP 6 Application specific cabling systems
TOP 6.1 ISO/IEC TR 11801-9906 Revision
TOP 6.2 Instruction to and report from ad hoc
TOP 7 ISO/IEC 24383 – Network Infrastructure Security JTC1-SC25/2982/CD
WG 3 N 1268
TOP 7.1 Instruction to and report from ad hoc
TOP 7.2 Resolve comments on CD
TOP 8 Amendment to ISO/IEC 18598 – AIM JTC1-SC25/2996/FDIS
TOP 8.1 Status of FDAM ballot
TOP 9 Review of ISO/IEC 30129 – Bonding
TOP 9.1 Instructions to and report from ad hoc – N.N. 3N1232A
TOP 10 Revision of ISO/IEC TS 11801-9903 Modelling
TOP 10.1 Tutorial on TS 11801-9903 – Dave Hess
TOP 10.2 Instructions to and report from JMTG – Dave Hess
TOP 10.3 NP on Revision of TS 11801-9903
ISO/IEC JTC 1/SC 25/WG 3 N 1267A
Date: 2021-01-20
5
TOP 11 Fibre Optic Cabling to the Premises (EN 50700)
TOP 11.1 Instructions to and report from ad hoc – Arne Parneby
TOP 12 Technical Report for Multi-drop
TOP 12.1 Instructions to and report from ad-hoc
TOP 13 Liaisons
TOP 13.1 Liaison to committees in charge of Basic Standards
TOP 13.2 Liaison to committees in charge of components
TOP 13.3 Check the list of liaisons
TOP 14 Reports
TOP 14.1 Press Release
TOP 14.2 Report to SC 25
TOP 15 Schedule of next meetings
TOP 16 Close of meeting