
- This event has passed.
IEC SC46C WG10 WEB
SC 46C/WG 10
Draft agenda and roster2020-10-22 |
INTERNATIONAL ELECTROTECHNICAL COMMISSION
TECHNICAL COMMITTEE 46: Cables, wires, waveguides, RF connectors, RF and microwave passive components and accessories
SUBCOMMITTEE SC 46C: Wires and symmetric cables
WORKING GROUP WG/10: Twinax cables
WEB MEETING to be held with IEC TC46/SC46C working group meetings, 2020-10-22 to 11-06.
SC 46C/WG 10 will have a web meeting on Thursday, October 22, 2020, at 11:00 UTC (UTC+0);
New York 07:00 EDT (UTC-4), London 12:00 BST (UTC+1), Paris 13:00 CEST (UTC+2),
Shanghai 19:00 CST (UTC+8), Tokyo 20:00 JST (UTC+9).
Timetable: meeting hours (UTC), 11:00 – 14:00; break scheduled: 12:30 – 12:45
Zoom WEB meeting login info:
Meeting id: 94362284869
Link to join meeting: https://iec.zoom.us/j/94362284869?pwd=Sk1hZUkyaG9pNFdmdEVuVG9EN0o5dz09
Dial-in numbers: https://zoom.us/zoomconference
Item | Description | Documents/Who | |||
1 | Opening of the meeting, 11 attendees | Host, DH | |||
1.1 | Agree recorder of the minutes, agreed | TBD | |||
2 | Review of members participation: introductions, regrets; | DH see attachment A |
|||
3 | Approval of the agenda;
Agenda changes are highlighted and appear within the respective items: |
DH this document |
|||
4 | Confirmation of the minutes of the of the last meeting | ||||
4.1 | Review Virtual Tel Aviv minutes | DH …draft…-20200505B.docx |
|||
4.2 | Review of action items | ||||
4.2.1 | Update from Virtual Tel Aviv | ||||
TLV-1 | 62783-1-1 complete RVN; prepare and circulate (12 wks) CD by about June 1; Complete | YY, LD, DH | |||
TLV-2 | To start ad hoc work on 62783-1-2 “impedances”; Incomplete | YY, DH | |||
5 | Information from IEC Central Office: | DH | |||
5.1 | Common Patent Policy for IEC, ISO and ITU: http://www.iec.ch/members_experts/tools/patents/patent_policy.htm |
DH | |||
5.2 | IEC code of conduct for delegates and experts: http://www.iec.ch/about/brochures/pdf/tools/IEC_Code_of_Conduct.pdf |
DH | |||
6 | Liaison reports | Liaisons | |||
6.1 | Liaison reports from IEC: | ||||
6.1.1 | ISO/IEC JTC1 SC25: (see report to SC46C/WG7) | DH | |||
6.1.2 | SC48B: (see report to SC46C/WG7) | DH | |||
6.1.3 | Info from SC46A, SC46C, SC46F other TC46 WGs | GG, TH, WZ, CP | |||
6.2 | Reports from other committees | Reporters | |||
6.2.1 | Info from IEEE 802.3 ck, IEEE EMC P370
Other |
Tbd | |||
7 | Project review, from the TC 46/WG 9 program of work
Notes: |
PLs
See attachment B |
|||
7.1 | IEC 62783 series, Twinax cables for digital communications | ||||
7.1.1 | IEC 62783-1 ED1
Twinax cables for digital communications – Part 1: Generic specification FDIS approved 2018-09-28; Published 2019-01-24 Comments: deferred to next edition TD measurements placed into -1-1 To consider RR per stability date, 2020 |
46C/1113/RVD
46C/1107/FDIS 46C/1075/RVC 46C/1053/CDV |
|||
7.1.2 | IEC 62783-1-1 ED1
Twinax cables for digital communications – Part 1-1: Time domain test methods for Twinax cables for digital communications, General Requirements 46C/1154/CD, closed 2020-2020-08-21 To prepare CC To resolve comments |
46C/xxxx/CC
46C/1154/CD 46C/1153/RVN 46C/1139/NP Pre-WD /YY |
|||
7.1.3 | IEC 62783-1-2 ED1
Twinax cables for digital communications – Part 1-2: Twinax cables for digital communications, Impedances Preliminary WD To be discussed. |
Pre-WD
/YY |
|||
7.1.4 | IEC 62783-2 ED1
Twinax cables for digital communications – Part 2: Family specification – Cable for Ethernet-over-twinax physical interfaces FDIS approved 2018-09-28; Published 2019-01-24 Comments: deferred to next edition To be synchronized with 62783-1 To consider RR per stability date, 2020 |
46C/1108/RVD
46C/1103/FDIS 46C/1076/RVC 46C/1054/CDV |
|||
8 | Maintenance review, from the stability dates:
Note: 62783-1 RR TBD, stability date, 2020 62783-2 RR TBD, stability date, 2020 n/a |
PLs see attachment C |
|||
9 | Any other business, considering new work items: | All | |||
9.1 | IEC 62783-2-1
Twinax cables for digital communications – Part 2 – 1: Family specification – Cable for Ethernet-over-twinax physical interfaces – Detail specification Preliminary WD To be discussed. |
||||
9.2 | IEC 62783-3 ED1
Twinax cables for digital communications – Part 3: Family specification – Cable for SATA physical interfaces To consider a preliminary investigation for next standards in this series See YY Roadmap To be discussed |
||||
10 | Review of new action items from WEB MEETING (virtual Paris): | DH see attachment D |
|||
Web1-1 | |||||
11 | Date and place of next meeting: see SC46CTBD |
||||
12 | Close of the meeting: | DH | |||
Attachment A
Membership
Function | Last_Name | First_Name | NC | Present | |
Member | Achermann | Wendelin | CH | wendelin.achermann@datwyler.com | |
Member | Brillhart | Theodore | US | theo.brillhart@flukenetworks.com | |
Member | Celella | Brian | US | brian_celella@siemon.com | |
Member | Dardel | Boris | CH | bdardel@aesa-cortaillod.com | |
Member | Dlugas | Wolfgang | DE | wolfgang.dlugas@hew-kabel.com | |
Member | Eichhorn | Michael | DE | michael.eichhorn@online.de | |
Member | Fischer | Peter | CH | p.fischer@bks.ch | |
Member | Gomarasca | Giovanni | IT | g.gomarasca_std@cavilab.it | |
Convenor | Hess | David | US | davecarlhess@outlook.com | |
Member | JIANG | Bin | CN | jiangbin@secri.com | |
Member | Mabbott | Neil | GB | neilmabbott5308@gmail.com | |
Member | Otieno | Florence | US | fotieno@tiaonline.org | |
Member | Shalev | Ziva | IL | Shalev_z@sii.org.il | |
Member | Stroumza | Eyal | IL | eyals@teldor.com | |
Member | YIN | Ying | CN | yinying@secrioec.com |
Attachment B
Program of work
Project
Reference |
Document
Reference |
Init.
Date |
Current
Stage |
Next
Stage |
Working
Group |
Project
Leader |
Fcst. Publ.
Date |
IEC 62783-1-1 ED1
IEC 62783-1-1 ED1: Twinax cables for digital communications – Part 1-1 :Time domain test methods for Twinax cables for digital communications , General Requirements |
46C/1154/CD | 2020-05 | PCC
2020-08 |
2020-09 | WG 10 | Ying YIN | 2022-12 |
Attachment C
Maintenance
Publication Number | Publication Date | Stability Date | Maintenance Team | Project in progress |
IEC 62783-1:2019 ED1 | 2019-01-24 | 2020 | ||
IEC 62783-2:2019 ED1 | 2019-01-24 | 2020 |
Attachment D
Decisions
Decision No. | Description | Documents/Who |
From Helsinki | ||
HEL | Complete | DH |
From Arlington | ||
DCA | Complete | DH |
From Frankfurt | ||
FRA | Complete | DH |
From Shanghai | ||
SHA | Complete | DH |
From Vladivostok | ||
VVO | Complete | DH |
From Lyon | ||
LYS | Complete | DH |
From Nuremberg | ||
NUE-02 | To prepare 62783-1 ED2 RR request, incomplete | DH |
NUE-03 | To prepare 62783-2 ED2 RR request, incomplete | DH |
From Arlington | ||
DCA-1 | General: DH to review documents (from Nuremberg and Lyon) to be attached to the minutes and update per omitted docs; incomplete | DH |
From Shanghai | ||
PVG-1 | To prepare and circulate 2783-1-1 NP & DC; SC46C secretary Ladji Diakite
1, project leader: Yin Ying 2, project team: “volunteers” Dave Hess, Thomas Haehner, Eyal Stroumza, Giovanni Gomarasca, Jiang Bin, Peter Fischer complete |
YY, DH, LD |
From Tel Aviv (WEB): | ||
TLV-1 | 62783-1-1 complete RVN; prepare and circulate (12 wks) CD by about June 1; Complete | YY, LD, DH |
TLV-2 | To start ad hoc work on 62783-1-2 “impedances”; Incomplete | YY, DH |